In two stages, the 550 MW solar power plant in Bikaner, Rajasthan, is being developed by the Brookfield Global Transition Fund (BGTF). In March 2024, the 268 MW first phase and the 282 MW second phase were put into service, bringing the total power output to 550 MW. The second phase is expected to cost USD 317 million. ..Read More